DV8 Energy Inc.: federal grants and contributions: 4 agreements; $1.2M value; 2 departments; 3 programs.
Assay record ASY-CA-09BWTY91WQ · Cite as: Assay Systems, “DV8 Energy Inc.: federal grants and contributions”, https://assay-systems.com/register/ca/grants/r/dv8-energy-inc/
Mitigating tariff impacts by onshoring production and expanding global markets
DV8 is building a rod string design software product called DV8 Dynamics. This software will design the sucker rod pumping system and eliminate the high error rate in rod string design. The current software used for designing wells was developed when wells were mainly vertical and does not produce an accurate rod design for deviated wells. This ends up costing producers a significant amount of money due to increased maintenance issues, equipment failures and the associated losses in production and work over costs. DV8 will develop a gas lift solution. DV8 GL will use machine learning models to
One of the major challenges with industrial internet of things technology (iiot) is connecting the physical devices in the field to the cloud. Systems need to be easy to install otherwise it creates more challenges to technology adoption. This project aims to design and develop easy to use iiot hardware. The challenge with the existing systems is the complexity involved in configuring devices and the time spent wiring and troubleshooting in the field. This project will design a system for preconfiguring units remotely and engineer plug and play systems for faster deployment. This will reduce
The project will consist of running DV8 edge devices on a number of different wells. The Firm wants to test its mathematical model over a range of different well types in terms of depth, deviation and complexity. The wells are heavy oil wells, using rod pumps & Rotaflex surface pumping units. The edge device will gather data, complete diagnostics on downhole conditions, display the generated downhole dynamometer card to the user through the internet, and send commands to the pumping unit to speed up if more production is available, or slow down to save energy. The depth ranges from 1200 meters
Contains information licensed under the Open Government Licence – Canada. Source: Government of Canada proactive disclosure of grants and contributions (open.canada.ca, dataset 432527ab-7aac-45b5-81d6-7597107a7013), 1,327,352 rows as published, collapsed to one agreement per agreement number (per reference number where none is given) at its latest amendment, which carries the full agreement value. Years are the agreement start year. Agreements with individuals are counted but not named.